The excavator leaves, the crane leaves, and someone still has to put the property back. That's the job we're built for.
By the time restoration happens, the money's been spent, the schedule has slipped, and everyone wants to be finished. Which is exactly why this stage gets rushed — spread some topsoil, roll out sod, invoice, leave. Six weeks later the lawn is patchy, the beds are settling, and the property owner is unhappy about a job that was otherwise done well.
Restoration is where the file either closes or stays open. We treat it as its own scope of work with its own standards, not as cleanup.
Deep trenches around a structure, large spoil piles, complete destruction of the lawn within the work zone, and backfill that will settle for years.
Water, sewer, gas, electrical and communications trenches crossing lawns, beds, driveways and hardscape.
Compaction from equipment and material storage across the entire site, buried construction debris, and topsoil stripped or buried.
Crane and truck access into rear yards, ground protection that didn't cover everything, and beds crushed by debris and equipment. Emergency tree removal →
Concrete washout, brick, offcuts, form lumber, wire and packaging. Anything left in the soil surfaces eventually, usually through a mower.
Construction traffic compacts soil past the point where roots grow or water infiltrates. Tilling the top few inches doesn't reach it. Subsoiling or deep tillage does, and it's the difference between a lawn that establishes and one that struggles indefinitely.
Excavation mixes subsoil clay into what used to be topsoil. Restoration means placing screened topsoil at a real depth, not spreading a cosmetic layer over clay.
Positive drainage away from structures, re-established with instruments. Backfill settlement means grade often needs revisiting — we plan for it and say so upfront.
Downspout extensions, drain lines and swales interrupted during construction, restored and tested rather than assumed.
Edges re-established, soil replaced and amended, planting reinstated to match what was there.
Sod or seed, on prepared soil, to finished grade. Sod replacement →
Interlock, edging, steps and walkways lifted or damaged during the work, rebuilt by our own crews. Exterior restoration →
Restoration is the most-disputed line on an exterior file, because the "before" is gone and everyone remembers the property differently.
We photograph the pre-existing landscape before any equipment moves — lawn condition, bed layout, plant material, hardscape, grade. Wide shots and detail shots, dated. On emergency jobs where there's no time for a full survey, the crew still gets a photo sequence before the first cut.
That record does two things: it establishes what's actually owed, and it protects against claims for conditions that pre-dated the work. It's fifteen minutes of a crew's time and it settles arguments that otherwise take weeks.
Usually it forms part of the loss, since the damage was a necessary consequence of mitigating it — but coverage is the adjuster's determination. Our part is documenting the pre-existing condition and the damage caused, and scoping the repair accurately.
Sometimes it shouldn't. Backfill settles, and sodding over fresh deep backfill often means redoing it. Where settlement is likely we'll recommend a staged approach and explain the trade-off rather than install work we expect to fail.
Regularly. Many GCs hold the restoration line and bring us in to execute it, because it's outside their trade base and it's the part their client sees most.
Common, and easily handled — we scope the like-for-like restoration separately from the upgrade so the claim portion stays clean and the owner can pay the difference directly.
We'll get you a documented, itemized scope for the entire exterior — trees, hardscape and landscape on one file. Scoping and photo documentation are no charge.